Northern VA crews available now · free walkthroughs(703) 650-5655|Mon–Sat 8am–5pm

Home / Build & Outdoor Living / Outdoor Living Design & Build / Reston

Reston, Virginia

Outdoor Living Design & Build in Reston, Virginia

Reston was planned from the start in 1964 around village centers and shared open space, and Reston Association’s Design Review Board still signs off on almost every exterior change — from the mid-century clusters near Lake Anne to the newer high-rises around Reston Town Center and the Silver Line. We design and build patios, kitchens, fire features, and lighting as one connected system, sequenced around Fairfax County's permit process and Reston Association's design review together.

Veteran-OwnedLicensed & Insured5.0 from 13 Google ReviewsQuotes in 24–48h

The Short Answer

Outdoor living projects in Reston typically run $13,000–$40,000. Reston falls under Fairfax County's building permit process — decks and structures more than 16.5″ above grade need a permit, with plan review typically running 3–5 weeks, while ground-level patios usually don't require one. On top of that, almost every property in Reston is covenanted land under Reston Association, so any exterior change also needs sign-off from the Design Review Board (DRB) before work starts. Older Lake Anne and Hunters Woods lots carry different grading and tree-canopy conditions than the newer construction near Reston Town Center — we handle both approvals and deliver a written, line-item quote within 24–48 hours.

What's Included

Design & Build, One Cohesive Plan

  • On-site design consultation & property assessment
  • One plan for patio, kitchen, fire feature & lighting
  • Fairfax County permit & Reston Association DRB sequencing handled for you
  • Grading & drainage engineered for Reston's village-specific lot conditions
  • Same crew from first plan to final walkthrough
  • Written, line-item quote within 24–48 hours

Local Knowledge

What Building in Reston Actually Involves

  • Permits & TimingMost decks and any structure more than 16.5″ above grade need a Fairfax County building permit; plan review typically runs 3–5 weeks. Ground-level patios usually don't require one — we tell you exactly which applies to your project.
  • Reston Association Design ReviewReston was founded in 1964 by Robert E. Simon as a planned community, and nearly every property is covenanted land under Reston Association. Its Design Review Board (DRB) requires approval for almost any exterior change — patios, fire features, and structures included — before construction starts. We prepare and submit the DRB application alongside the county permit, not after it.
  • Village-by-Village Lot DifferencesReston's five built villages — Lake Anne, Hunters Woods, Tall Oaks, South Lakes, and North Point — developed in different decades with different grading. Lake Anne's mid-century clusters sit on smaller, wooded lots near the lake, while newer construction around Reston Town Center and the Silver Line has different setbacks and drainage patterns — we design to the specific village, not a single template.
  • Lake & Pathway ProximityMany Reston lots back up to Lake Anne, Lake Newport, Lake Audubon, or the community's extensive pathway system, which can trigger additional DRB review for anything near shared common area or water — we flag this during the site walkthrough so it's factored into the design from day one.

Why Homeowners Choose Us

Design and Build, Under One Roof

Permit & DRB Fluency

We run Fairfax County permit review and Reston Association's Design Review Board approval together, not one after the other.

Built for Reston’s Village Conditions

Lake Anne's wooded, mid-century lots and the newer grading near Reston Town Center are accounted for in the design, not discovered mid-build.

Real Local Accountability

The same crew that designs your project builds and finishes it.

Licensed & Insured

Fully licensed and insured in Virginia, with workers' comp and general liability on every Reston job.

Areas We Serve

Outdoor Living Design & Build — Areas We Serve in Reston

Completed outdoor living patio and fire feature build in a Reston, Virginia backyard

We build outdoor living spaces across every village in Reston, from the mid-century clusters near Lake Anne to the newer streets around Reston Town Center and South Lakes. ZIP codes 20190, 20191, and 20194 cover Reston.

  • Lake Anne
  • Hunters Woods
  • Tall Oaks
  • South Lakes
  • North Point
  • Reston Town Center
  • Lake Newport
  • Lake Audubon
  • Wiehle-Reston East
  • Fox Mill
  • Golf Course Island
  • Waterview

What Neighbors Say

Trusted on Backyards Like Yours

★★★★★

“The Design Review Board approved our fire feature plan on the first submission. They clearly knew exactly what Reston Association needed to see before we even applied.”

S
Sandra L.Lake Anne, VA
★★★★★

“Our lot near Lake Newport backs right up to the pathway system, and I was sure that would be a problem. They designed around the setback and DRB signed off without any changes.”

K
Kevin O.North Point, VA
★★★★★

“We're in one of the older clusters near Hunters Woods and the tree roots made past contractors nervous. This crew stepped the patio around them instead of just cutting through.”

J
Jenna R.Hunters Woods, VA

Reston, Answered

Outdoor Living Design & Build FAQs

Does Lawn Theory handle Reston Association DRB approval as well as the county permit?

Yes. Reston falls under Fairfax County's building permit process, and almost every property is also covenanted land under Reston Association, which requires separate Design Review Board (DRB) approval for exterior changes including patios, fire features, and structures. We prepare and submit both as part of your project.

How long does Reston Association's Design Review Board take to approve a project?

DRB review timelines vary by application type and whether a full board or panel review is required, and approved work generally has to start within six months and be substantially complete within eighteen. We build your project schedule around the DRB timeline so approval and construction don't stall each other.

My lot backs up to a Reston lake or pathway — does that change what I can build?

It can. Properties near Lake Anne, Lake Newport, Lake Audubon, or Reston's common-area pathway system often face additional DRB scrutiny on setbacks and sightlines from shared land. We identify this during the site walkthrough and design with it in mind from the start, rather than finding out after a DRB submission is rejected.

Is building different in Reston's older villages like Lake Anne versus newer areas near Reston Town Center?

Yes. Lake Anne and Hunters Woods were built in the 1960s on smaller, more wooded lots with mid-century grading, while construction near Reston Town Center and the Silver Line corridor sits on different, more recently engineered grades. We design to the specific village's site conditions rather than a one-size template.

What does an engineered foundation mean for a patio or outdoor kitchen build in Reston?

It means the base under your patio or outdoor kitchen — compacted sub-base, a proper drainage slope, and, for kitchens, a reinforced footing sized to the structure's weight — is designed for the specific village's soil and grade instead of poured straight onto grade.

Can you design a full outdoor living space that includes a kitchen, fire feature, and lighting, or only individual elements?

We do both. Most Reston homeowners start with one element, like a patio or a fire feature, but we design every project against a full outdoor living plan for the property, so a kitchen, lighting, or a pergola can be added later without redoing what's already built or needing a second DRB submission from scratch.

Does a patio or fire pit require Fairfax County or Reston Association approval, or only decks and structures?

Fairfax County generally only requires a building permit for decks and structures more than 16.5 inches above grade, with ground-level patios and fire pits usually exempt. Reston Association is stricter: nearly any visible exterior change, including a ground-level patio or fire pit, still needs DRB or Covenants staff review since the land itself is covenanted — we flag this distinction during the walkthrough so it's never a surprise on your quote.

Ready to Build Something That Lasts?

Get Your Free Reston Quote

Tell us about your backyard and we'll send a written, line-item quote — usually within 24–48 hours.

Scroll to Top